The quote she says yes to
You say: Quote Sarah’s bathroom, £8,250. She’s supplying the tiles.
A quote page she accepts in one tap. Bathroom quotes get compared; if hers has no answer for a week, the evening wrap says so.
Say the job and the price, and Sarah gets a quote in your business’s name to accept in one tap. The deposit that books your slot, a stage at first fix and the balance all come from the same job, and the extras are on the record the day you agree them. If she goes a week with no answer, the evening wrap tells you.
iPhone. First month free, no card.
Tools Down: Done. £8,250 for Sarah’s bathroom.
Bathroom refit
Sarah Hughes
Total£8,250
Heard on the forums
I hate it when you spend a couple of hrs doing a quote and never hear back from people. The guy that taught me keeps saying I should chase the people up. I am just not that kind of person though.
Deposit, stages, then the balance
Ask for the deposit when she accepts. After first fix, invoice a stage as a percentage or an amount and see what’s left to bill. When the job’s done, the final invoice takes the deposit and the stage off and asks for the balance.
Bathroom refit
Sarah Hughes
Total£2,887.50
What matters on your jobs
You say: Quote Sarah’s bathroom, £8,250. She’s supplying the tiles.
A quote page she accepts in one tap. Bathroom quotes get compared; if hers has no answer for a week, the evening wrap says so.
You say: Sarah’s job: moving the radiator, £180, agreed today.
Saved on the job at that price, the day it’s agreed, so it reaches the final invoice and there’s a record when the balance is queried.
You say: Show me the tanking at Sarah’s.
Tanking, pipework, the floor before the boards go down: filed on the job as you take them, found again by asking when a leak or a snag is disputed.
Price and the free plan
£29.99 a month including VAT, or £24.99 if you reclaim VAT. One person, no minimum, no setup fee, no training.
Tools Down for iPhone
Coming soon on the App StoreFirst month free, no card.
Straight answers
Yes. Ask for it as a percentage or an amount, and bill stages the same way. The final invoice takes the deposit and every stage off.
Usually, within 14 days, because it’s an off-premises contract. If they weren’t told about the right to cancel, the period can run up to 12 months longer (reg 31).
Replacing baths, toilets, basins and sinks needs no approval; a new bathroom involving plumbing, or electrics near the bath or shower, may (GOV.UK: building regulations approval). Members of APHC, BESCA, Certsure, HETAS and NAPIT can self-certify.
Take photos as you go. Tools Down files them on the job, and you can ask for them later: “show me the tanking at Sarah’s.”
Only for certain fittings in England and Wales, for example a bath over 230 litres (Water Supply (Water Fittings) Regulations 1999, reg 5).
Paperwork and rules
Information, not advice. Open a rule to read it, with its source; check the source for your own job.
A job agreed in the customer’s home is an off-premises contract: 14 days to cancel, and up to 12 months more if they weren’t told about the right.
Installing a bathroom that involves plumbing, or changing electrics near a bath or shower, may need approval. Replacing baths, toilets, basins and sinks needs none.
Toilets, sinks, washbasins, fixed baths, showers or bathrooms in dwellings can be self-certified by members of APHC, BESCA, Certsure, HETAS or NAPIT.
Notice and consent are needed before installing a bath of more than 230 litres, or a pump drawing more than 12 litres a minute.
HMRC lists installing kitchens and bathrooms as construction operations. Private householders aren’t contractors under CIS.
Your work
Keep looking